Engineering Study Has Been Approved

To recap the project to this point, the project Engineering Study was prepared and submitted to the New Hampshire Department of Transportation (NHDOT) for review and approval. The NHDOT approved the Engineering Study and recommendation for replacement of the historic bridge due to the severe deterioration of the bridge. This project will be partially funded from the NHDOT State Bridge Aid program.